2014 Capital Project – LP Quinn Scope of Work

Preserving our resources and preparing for our students’ future.


– Reconfigure parking for separation of student drop-off / bus lane
– Upgrade restrooms in classrooms (28) to comply with ADA
– Construct new outdoor pump house with restroom at upper
– Reconstruct / pipe size pump size of sewer system
– Replace unit ventilators
– Replace original windows with energy efficient windows
– Renovate K-4 student storage units
– Replace roofing at 3rd Grade and main roof
– Create private new entrance for students to counselor office
– Replace original part of gym floor
– Install new cooler and kitchen refrigerator / ovens
– Add electric power and water to baseball and soccer fields
– Add storage, concession, restrooms near softball field
– Install exterior bleacher pads (12’ x 8’), portable bleachers
– Install new fence and backstop at varsity baseball field
– Install dual use scoreboard for soccer / baseball field
– Level, add topsoil, seed, fertilize JV baseball and JV soccer fields
– Install 10’ asphalt drive around rear of school  (700 lf)
– Re-surface track