2014 Capital Project – Bus Garage Scope of Work

Preserving our resources and preparing for our students’ future.

– Replace ceiling / PT
– Enclose soffits and overhangs at roofline
– Replace electric service from power pole to building
– Repave parking / drive area and replace sidewalk (or raise floor)
– Replace overhead doors
– Modify / enlarge restroom for ADA accessibility