2014 Capital Project – Civic Center Scope of Work

Preserving our resources and preparing for our students’ future.

– Install stair exit at Press Box
– Replace furnace – Zamboni Room
– Install panic bars at front entry (5) locations
– Add removable mullion (5) locations
– Install asphalt at side entry – Pad 12’ wide to road
– Provide sport floor for rink surfacing
– Upgrade Fire Alarm System (NCC)